New and Used Excavator Grab insights
There are 653 Excavator Grab for sale in Australia from which to choose. Overall 27% of Excavator Grab buyers enquire on only used listings, 70% on new and 8.79% on both new and used Excavator Grab items. Buyers usually enquire on 2.21 different Excavator Grab classifieds before organising finance.
Excavator Grab are listed between $950 and $120,000, averaging at $7,051.
The most popular searched Excavator Grab brands with Australian buyers are currently roo attachments, EXEQ, SEC, Gardner Engineering Australia and betta bilt buckets. The fastest growing brand with buyers in the last 12 months has been norm.
23 Apr,2019 -
One of the reasons excavators are such versatile machines is the sheer number of attachments they can use. Whether it’s digging a hole, moving objects, or crushing concrete, there’s an attachment for it. For a quick run-down, we’ve compiled a list of the most popular excavator attachments on Machines4U and what they are used for. ...
27 Aug,2026 -
Presented by Manheim August 26, 2026 Leading heavy equipment auction provider, Manheim Industrial Australia, is proud to present a major crane liquidation auction in New South Wales on behalf of SV Partners. The Major Cranes Liquidation sale featuring quality used cranes and support equipment is based out of Manheim’s Beresfield site in Newcastle, with ...
11 Sep,2026 -
Presented by Melbourne Tractors (T/A Brisvegas Machinery) On major infrastructure projects, managing the interaction between people and mobile plant remains a critical safety challenge. As worksites become more complex, technology is providing operators with greater visibility and situational awareness around the machine. A recent visit to Suburban Rail Loop (SRL) Glen Waverley project, provided ...
11 Sep,2026 -
Presented by CDE Group Need for a New Sand Supply Solution As Featured in Quarry December 2025 issue. Bolwarra Enterprises managing director Ian Kidner does not hold back when describing the impact of CDE Group’s sand washing plant at Wongabel Quarry. With more than 40 years of experience in the quarrying sector, he ...
22 Oct,2026 -
Presented by Earth Gear Australia Downtime rarely starts when a machine stops. On civil sites, it often starts earlier: when a machine is accepted as “available” without being physically validated, a service interval is pushedpast a production window, a hydraulic issue is monitored rather than addressed, or no replacement path has been agreed for plant on the critical path. ...