ECH is a manufacturer and supplier of wear parts and attachments to various industries in Australia including construction, quarrying, contract mining, demolition, waste and recycling, and agriculture since 1992. They have continuously provided tough, innovative, and cost-effective products that increase productivity and safety within the said industries. Their facilities in Melbourne and India have allowed their customers to quickly access their wide range of products and maintenance services.
23 Apr,2019 - One of the reasons excavators are such versatile machines is the sheer number of attachments they can use. Whether it’s digging a hole, moving objects, or crushing concrete, there’s an attachment for it. For a quick run-down, we’ve compiled a list of the most popular excavator attachments on Machines4U and what they are used for. ...
27 Aug,2026 - Presented by Manheim August 26, 2026 Leading heavy equipment auction provider, Manheim Industrial Australia, is proud to present a major crane liquidation auction in New South Wales on behalf of SV Partners. The Major Cranes Liquidation sale featuring quality used cranes and support equipment is based out of Manheim’s Beresfield site in Newcastle, with ...
11 Sep,2026 - Presented by Melbourne Tractors (T/A Brisvegas Machinery) On major infrastructure projects, managing the interaction between people and mobile plant remains a critical safety challenge. As worksites become more complex, technology is providing operators with greater visibility and situational awareness around the machine. A recent visit to Suburban Rail Loop (SRL) Glen Waverley project, provided ...
11 Sep,2026 - Presented by CDE Group Need for a New Sand Supply Solution As Featured in Quarry December 2025 issue. Bolwarra Enterprises managing director Ian Kidner does not hold back when describing the impact of CDE Group’s sand washing plant at Wongabel Quarry. With more than 40 years of experience in the quarrying sector, he ...
22 Oct,2026 - Presented by Earth Gear Australia Downtime rarely starts when a machine stops. On civil sites, it often starts earlier: when a machine is accepted as “available” without being physically validated, a service interval is pushedpast a production window, a hydraulic issue is monitored rather than addressed, or no replacement path has been agreed for plant on the critical path. ...
No testimonials available.
No videos available.