******NOTE: HOSE REEL NOT INCLUDED*****
- Module Manual Assembly Line -
• Rotary Lifting Table, Gravity Fed Loading Conveyor
• Manual Conveyors - Metal Rollers
• Banding Station - Fromm Bander - S/N
• Voltage Scanner/Camera: 1x Cognex STC-HD213DV
• Control Box, Push Buttons, E Stops, Multi Plugs, Red/Green Lights, Rexroth Down Lighting, Internal Cable Routing
- Pack Assembly Line -
• Gravity Fed Loading Conveyor
• Manual Conveyors - Metal Rollers
• Barcode Scanner - Powerscan Datalogic
• Voltage Scanner/Camera: 1x Cognex STC-HD213DV
• Lighting System To Check Batteries Are Affixed Incl Lenovo Display Screen
• Rexroth Lighting
• Station To Fit Wiring Harness - Rexroth Nexo Tensioner Mounted On Telescopic Arm.
• Control Box, Push Buttons, E Stops, Multi Plugs, Red/Green Lights, Rexroth Down Lighting, Internal Cable Routing
Located At: Newcastle