When installing kerb stones it is mandatory to get them backfilled with concrete formwork as per DIN 18318. To avoid time-consuming and expensive assembly of timber formwork at the construction site we developed a slipform with lots of clever features.
The slipform GR-150 adjusts to all prevalent precast kerb dimensions. Effortless sliding due to rollers equipped with ball-bearings.
Within seconds the slipform plate is removed from the formed concrete and put into working position again by 2 eccentric levers.
To compact the concrete backfill - according to DIN specifications - the GR-150 comes with a hand tamper including fastener.
Further information
Applicable at not too narrow curves as well.
Significant saving of material to some extend compared to conventional concrete liner.
Optional add-on: Link rod for slipform KS-GR-150. This connection rod links up two or more slipforms for formwork building.
Durable surface protection by galvanizing.
Technical details
Weight Dead Weight (kg): 32
Length (mm): 1500
Width (mm): 80-200
Working Width (mm): 150